Referencie

FORM FACTORY Fitness center

Building services engineeringDesign&BuildProject management
The client:
Form Factory
Office space:
Form Factory Fitness center
Area:
1 520 m²
Full fit out:
realization
Year of implementation:
2025
Location:
Bratislava Rínok Rača

The description of a project

Form Factory – a space with a breath of movement

For the client Form Factory, we delivered a comprehensive fit-out of a new facility within the Rínok Rača project. The brief was clear: to transform a shell-and-core space into a top-tier sports facility meeting the highest standards.

We managed the entire process from A to Z—from initial planning, through multidisciplinary coordination, to final cleaning and turnkey handover.

Scope of Works: The project required precise coordination of construction and technological processes. Techno Box Services provided:

  • Project Management: Complete construction management, coordination of contractors, and preparation of documentation for occupancy approval.
  • Construction Works: Dry construction systems, insulation, screeds, core drilling, and surface finishes (tiling, flooring, painting).
  • Technologies & Building Services (MEP): Installation of ventilation with heat recovery, cooling systems, underfloor heating, heat pumps, and complete utility distribution (water, sewage, electrical, IT, fire alarm system, and sound system).
  • Interior & Functionality: Installation of specialized sports flooring, delivery of custom-made joinery elements (reception desk, stages), installation of sanitary equipment, and acoustic systems.

The project was completed within the agreed timeframe and delivered in the required quality.

The result is a modern space fully prepared for operation, providing visitors with maximum comfort for both training and recovery.